Thursday 25 April 2013

Polbrook Gurney Colliery Update - messing about with Das

T minus just over 4 weeks, here is the state of play. Lots to do, for starters the pub needs a rear and the smelly pond needs something wet and smelling in it. Maybe I should wait until Railex and wring out one of the whiffers and drain it/him into the pond?

This shot, albeit very wide angle (18mm lens on a full frame DSLR) has not been messed about with. The backscene is a huge print, not some kind of post exposure manipulation which is all rather yawn these days...

The chimney, wasn't really needed, but old collieries had all sorts of physical redundant links with the past and I wanted to see what could be done with 4 sheets of A4 printer paper rolled up with plenty pf PVA into a cone, a layer of Das followed by a quick manipulate with various items more at home in the kitchen and then popped into the oven for 30 mins at 150 c to dry out the Das. It's far from perfect, pretty rough actually, but hopefully it works, and more importantly for me was a quick fix. All in all, apart from drying was around 2.5 hours work.

No comments:

Post a Comment

All posts will be approved before they go live, posts from spammers will be deleted and marked as spam.